INDEPENDENT RESEARCH · OHIO PILOT

Data Center Impact

Find data centers near you. See what is known about their water and electricity use.

Find data centers near you

miles

Loading…

What we know

Listed locations—Not a complete census
Reported water consumed · 2025——
Actual electricity useUnknownNo facility-level totals verified

Water totals include only matching campuses with published figures. Missing data is not zero.

Map

Blue = water data available; gray = no verified water figure. Markers show approximate community locations, not buildings. Distances are approximate.

Data center directory

Broader context

Columbus water utility

1.263 billion gallons supplied to 115 data center addresses, May 2025–May 2026, approximately 3% of total system use.

Reported by the Columbus Dispatch using municipal records; this is utility-supplied water, not necessarily water consumed. It covers a different geography and period than the campus figures. Do not add the two.

Read the reporting

United States electricity

176 TWh in 2023, approximately 4.4% of US electricity use, estimated by Lawrence Berkeley National Laboratory.

Department of Energy report summary
Explore a hypothetical electricity and water scenario

This calculator is not an estimate of any listed campus. Enter your own assumptions for one hypothetical facility.

Sources & methods

Withdrawn: water taken from a supply. Discharged: water returned after use. Consumed: withdrawal minus discharge, including evaporation.

2025 Google campus water data comes from the 2026 Environmental Report, page 97, with third-party limited assurance. Other locations are provisional directory listings unless linked to an operator source. Electricity usage is not inferred from water.

ZIP search uses Zippopotam.us via our API; GPS coordinates stay in the browser. No location is required. Map tiles are provided by OpenStreetMap.

Google environmental report